Sale33863

Sale Timed Law court of Napoli Judicial Liquidation n. 137/2024

Inactive biogas power plant in Grazzanise (CE) - LOT 2

  • Inactive biogas power plant in Grazzanise (CE) - LOT 2
  • Inactive biogas power plant in Grazzanise (CE) - LOT 2
  • Inactive biogas power plant in Grazzanise (CE) - LOT 2

Starting priceEUR 222.187,50

Sale state

Sale experiment number3

Reduced by-44,00%

LocationGrazzanise (CE)

Minimum bidEUR 166.640,63

Minimum overbidEUR 1.000,00

Auction modeTimed

Offers deadlineWed 09/12/2026 at 12:00

Auction dateThu 10/12/2026 at 16:00

Deposit10,00% dell'offerta

Overbid time5 minutes

Buyer's premium7,00%

Indicated prices VAT and fees excluded

Request viewing Request more info PVP Data
ID Inserzione4646917
4e3a4be2-c961-11f1-97ea-0a586443160d
Procedura
Tipologiagiudiziaria
ID Procedura1007267
Tipo Proceduragiudiziaria
ID Tribunale0630490096
ID RitoLG
ID RegistroPROCEDURE_CONCORSUALI
TribunaleTribunale di NAPOLI
RegistroPROCEDURE CONCORSUALI
RitoLIQUIDAZIONE GIUDIZIALE (CCI)
Num.Procedura137
Anno Procedura2024
Soggetti
  • Soggetto
    TipoSoggetto specializzato alla vendita
    Nome
    CognomeGobid international auction group srl
    Cod.Fisc.GRGNDR67A25H211F
    Email[email protected]
    Telefono0286882269
    ID Anagrafica5608194
    Soggetto VenditaNo
    Soggetto VisitaSí1
  • Soggetto
    TipoCuratore
    Nome
    CognomeGervasio
    Cod.Fisc.GRVNDR82L21F799C
    Email[email protected]
    Telefono0815052650
    ID Anagrafica5608195
    Soggetto VenditaSí1
    Soggetto VisitaNo
Lotto
ID Lotto2499661
Descrizione (IT)Impianto di energia a biogas inattivo a Grazzanise (CE), Via Albergo Lungo snc - LOTTO 2
Primo Identificativo2499661
Codice2
GenereIMMOBILI
CategoriaIMMOBILE INDUSTRIALE
IndirizzoVia Albergo Lungo
ComuneGrazzanise
ProvinciaCaserta
RegioneCampania
NazioneItalia
Beni
  • Bene
    ID Bene3217329
    Descrizione (IT)Impianto di produzione di energia da Biogas, composto da digestore in cemento e da un motore endotermico di cogenerazione in container e attrezzature quali tubazioni, pompe, trincee e capannoni per lo stoccaggio, cabina elettrica, sito in via Albero Lungo. L'unità è stata costruita su suoli alieni in forza di contratto di cessione del diritto di superficie su suoli alieni per una durata di 20 anni, automaticamente prorogabili di 5 anni due volte e quindi di 10 anni salvo la facoltà riconosciuta alla concessionaria di rinunciarvi. Il canone è stato stabilito in 2500 euro/annui per i primi 20 anni e 3000euro/annui per i successivi 10. L'impianto ha una potenza elettrica pari a 100 kW, per una potenza elettrica massima erogabile quindi di 700 kW ed è costituito da un unico fermentatore alimentato da reflui zootecnici (oltre che da eventuali sottoprodotti di origine alimentare), raccolti in una pre-vasca opportunamente dimensionata e ricavata da volumi già disponibili in azienda. Il fermentatore è dotato di cupola gasometrica per lo stoccaggio del biogas. Il biogas prodotto viene convogliato al motore di cogenerazione per la produzione di energia elettrica e termica, previo pretrattamento di deumidificazione e desolforazione, mentre il digestato è convogliato alle attuali vasche di stoccaggio per essere riutilizzato come ammendante stabilizzato per la concimazione dei campi. L’alimentazione dell’impianto avviene utilizzando i reflui prodotti dall’azienda zootecnica nelle cui adiacenze è stato realizzato l’impianto stesso. In tal modo la biomassa potrà essere movimentata, in entrata ed in uscita del digestore, unicamente attraverso tubazioni interrate e pompe, evitando il trasporto su strada e/o con mezzi meccanici. Al fine di garantire una disponibilità costante di biomassa per l’alimentazione del digestore, ed evitare cali nella produzione del biogas, è stata prevista anche la predisposizione di un sistema di back-up di caricamento di sostanza palabile, in grado di sopperire ad una eventuale e transitoria carenza di biomassa pompabile dovuta a possibili problematiche aziendali. Non si rende necessario dotare l’area di alcun sito di stoccaggio per la biomassa integrativa, in quanto è previsto che la materia prima sarà trasportata all’occorrenza in sito secondo le esigenze di integrazione/alimentazione. Al fine di massimizzare il valore ovvero la sua redditività è opportuno riconvertire l'impianto attualmente inattivo di produzione da biogas a biometano. Sull’impianto è stato costituito in data 22/09/2016 Diritto di superficie e servitù (Registrato a Napoli 1 il 05/10/2016 n. 18732 Serie 1T)
    Primo Identificativo3217329
    TipologiaIMMOBILE INDUSTRIALE
    CategoriaFABBRICATI COSTRUITI PER ESIGENZE INDUSTRIALI
    IndirizzoVia Albergo Lungo
    ComuneGrazzanise
    ProvinciaCaserta
    RegioneCampania
    NazioneItalia
    Bene Immobile
    • Dati catastali
      Foglio/
      Particella/
    Tipo DenunciaProtocollo
Dati Vendita
Data e oraThu 10 December 2026 at 16:002026-12-10T16:00:00
TipologiaSENZA INCANTO
ModalitàASINCRONA TELEMATICA
IndirizzoVia Barone Rocco Galdieri 11
CAP80025
ComuneCasandrino
ProvinciaNapoli
RegioneCampania
NazioneItalia
Prezzo base222.187,50
Offerta Minima166.640,63
Rialzo Minimo1.000,00
Termine Presentazione OfferteWed 09 December 2026 at 12:002026-12-09T12:00:00
Siti
  • Sito
    ID72
    Tipologiagestore delle vendite
    Nominativohttps://www.gobidreal.it
    Indirizzo URLhttps://www.gobidreal.it
  • Sito
    ID22
    Tipologiasito pubblicita
    Nominativohttps://www.gobidreal.it/
    Indirizzo URLhttps://www.gobidreal.it/
Data pubblicazione16/10/20262026-10-16

Interested in partecipating as telematic user? Request the manual

  Ho letto ed accetto la


In order to send an offer and participate in the sale with telematic modes it is necessary to get a PEC mail address. In case the PEC account is not testing the ID it is necessary to digitally sign the offer document prior to confirm the offer.


No PEC? Ask for it here


PLEASE NOTE:
The file to be attached to the PEC 
[email protected] is a file in the following format: 
“offerta_xxxxxxxxxx.zip.p7m”.
It is reccomended not to open it or sign it otherwise it will not validated.

Lot description

ASYNCHRONOUS ONLINE SALE - Inactive biogas power plant in Grazzanise (CE), Via Albergo Lungo, no street number - LOT 2

Purchase offers may be submitted electronically using the "Online Bid" web form made available by the Ministry of Justice through this webpage.

Users are advised to start completing their offer well in advance of the deadline.

For further information about the lot and how to participate, consult the sale notice and the attached documentation

Procedure details

Law CourtNapoli

TypeJudicial Liquidation

Number137/2024

ReceiverDott. Andrea Gervasio

Goods included in lots (1)

  • Inactive biogas power plant in Grazzanise (CE) - LOT 2
  • Inactive biogas power plant in Grazzanise (CE) - LOT 2
  • Inactive biogas power plant in Grazzanise (CE) - LOT 2

Inactive biogas power plant in Grazzanise (CE) - LOT 2

Grazzanise (CE)

UP FOR AUCTION: Inactive biogas power plant in Grazzanise (CE), Via Albero Lungo, no street number - LOT 2

Biogas power generation plant, consisting of a concrete digester and a containerized internal combustion cogeneration engine, and equipment such as pipes, pumps, trenches and storage sheds, electrical substation, located on Via Albero Lungo.

The unit was built on third-party land under a contract granting a surface right over third-party land for a term of 20 years, automatically renewable twice for 5 years each, and therefore for a total of 10 years, unless the concessionaire exercises its right to waive the renewal. The annual fee was set at 2,500 euros for the first 20 years and 3,000 euros per year for the following 10 years.

The plant has an electrical capacity of 100 kW, for a maximum deliverable electrical output of 700 kW, and consists of a single digester fed with livestock effluent (as well as any by-products of food origin), collected in a suitably sized pre-tank created using space already available on the farm. The digester is equipped with a gasometer dome for biogas storage.
The biogas produced is conveyed to the cogeneration engine to generate electricity and heat, after pre-treatment for dehumidification and desulfurization, while the digestate is conveyed to the existing storage tanks for reuse as a stabilized soil conditioner for fertilizing fields. The plant is supplied using effluent produced by the livestock farm adjacent to which the plant itself was built. This means the biomass can be moved into and out of the digester solely through underground pipes and pumps, avoiding road transport and/or the use of mechanical vehicles. To ensure a constant supply of biomass to feed the digester and avoid drops in biogas production, provision was also made for a backup loading system for stackable material, capable of compensating for any temporary shortage of pumpable biomass caused by possible operational issues at the farm. There is no need to provide the area with a storage site for supplementary biomass, as the raw material is to be transported to the site as needed to meet supplementation and feeding requirements.

To maximize its value, or profitability, it would be advisable to convert the currently inactive biogas production plant to biomethane production.

A surface right and easement were established over the plant on 22/09/2016 (registered in Naples 1 on 05/10/2016, no. 18732, Series 1T).

For further information, please consult the appraisal report and the attached documentation.